Application of Preventive Maintenance in Planning Maintenance of Tablet Printing Machines in Drug Companies
Abstract
Companies that implement the production process will always be faced with market
competition. The process is done on the floor of the production required to produce a quality
product and is able to win the competition. Machine condition greatly affects the results of the
production process. A good machine will produce a quality product, otherwise the machine that
his condition is not good will result in products that are not qualified. Companies engaged in
the manufacture of the drug often have damage to the machine where the damage is mostly
caused by engine component of a machine failure function so that the machine could not start
the process when the operating damage to one of the machines at work, then the machine
production process will be interrupted because it takes time to replace components of the
machine. For that to be done, a step to improve the system of corrective maintenance which
currently used the company so that the damage to the engine at the time of the working hours
of the machine can be avoided. The purpose of this research is to get the engine maintenance
schedule intervals by performing a critical component replacement tablet printing machine
based on data obtained by the drug companies. Determining the schedule engine maintenance
done by using Reliability Engineering. Of research results in retrieved that components are
frequently damaged components namely Punch and Dies and the Pulley with the value of the
respective machine reliability of 0.3429 and 0.4183. While the time Interval component
replacement punch and dies the optimum is 791 hours per cycle of usage which means that the
components of the punch and dies must be replaced at a time when the machine operates 791
hours. Whereas in the pulley component the optimum replacement time interval is 1695 hours
per cycle of damage where the pulley component must be replaced when the engine is
operating 1695 hours.